Saturday, August 6, 2011

Powers House - Classic Prairie Style in West Centre Town Ottawa

Previously, I have written about E.P Connors House, the work of Ottawa architect Francis Conroy Sullivan in the early 1900's.  Sullivan was strongly influenced by the Prairie school and worked for several years with Frank Lloyd Wright, the best know architect of the prairie school movement.

Another example of Sullivan's work in the prairie style is Powers House - at the corner of James St. and Bay St. in Ottawa.  To quote from the Heritage plaque mounted on the building:



Originally built circa 1887 for businessman Patrick J. Powers, this house was transformed in 1915 by prominent local architect Francis C. Sullivan.  Sullivan created a Canadian version of American architect Frank Lloyd Wright's distinctive prairie style in the period before the first world war.  This house is distinguished by its wide eaves, horizontal wood bands, stucco finish and distinctive detailing.







I would have loved to have seen the inside of this house back in 1915. Wright was famous for also dedicating time to designing the inside of his houses too - even the furniture.  I am not sure if Sullivan had a similar tendency.  Today, however, it looks like this house has been divided up into three or four separate units, so I fear that if Sullivan did do any interior design, it may well be lost now.

Saturday, April 16, 2011

The federal GST rebate for renovations and new houses - Election issue

Since we are in the midst of an election, and since I live in a riding where there seems to be no shortage of homes being renovated or replaced, I thought it would be timely to repost an article that I wrote last year about the federal GST refund program for new or renovated homes (or lack thereof).  It would be nice if this program could be amended to better reflect the cost of homes now.

================================

If you substantially renovate your home or build a new one you may be eligible to receive a rebate of up to 36% of the GST you paid on goods and services to undertake the renovation.

Don't get too excited, however. There are conditions in place that effectively ensure most Ottawa home owners will be unable to claim this rebate.

First of all, you must substantially renovate your house. That means you must remove or replace at least 90% of the habitable interior. Basically, you would have to be undertaking a complete gut of the house, replacing all of the walls, electrical, plumbing and HVAC to qualify. You do not need to remove or replace foundation, roof or exterior walls to qualify, but if you do, they can count toward the 90%. Unfinished basements do not count as part of the habitable area for the purposes of calculating the percentage substantially renovated. If you basically tear down the existing house and build a new one, then you will also be eligible.

Second, the fair-market value of the house, which includes both the substantially renovated building and the land, must be less than $350,000 to receive a full rebate (i.e. 36% of the GST you paid). It's the fair-market value that is important here, not the cost of construction. If the fair-market value of the house exceeds $450,000 then you are not entitled to any rebate at all. And, if the value lies between $350,000 and $450,000 there is a formula to calculate the proportion of the rebate you are eligible for, which decreases to zero as the fair-market value approaches $450,000.

Unfortunately, the majority of Ottawa residents will never be able to qualify for the full rebate, if indeed they qualify for any rebate at all. You see, by the end of March 2010, the average price for a residential property in Ottawa (not including condominiums) was $354,698. With some exceptions, such as on the outskirts of Ottawa, it is hard to imagine the fair-market value of any substantially renovated or rebuilt house in Ottawa being less than $350,000.

If you are a condo owner, you might have better luck. The average price of a condominium in Ottawa in March 2010 was $240,409. That gives you some room, particularly if your condo is less than 1000 square feet. With average renovation costs running at about $100 per square foot, you could renovate 900 square feet of a 1000 square foot condo for about $90,000. If the pre-renovation value was $240,000, the completed fair-market value might still be below $350,000, entitling you to a full rebate (note that a full rebate is still only 36% of the GST paid).

Unfortunately, if you are reading this blog post from any other major centre in Canada, except Montreal, you have even less chance of qualifying for a rebate. That's because the average residential house price is higher in those centres - up to $800,341 in Vancouver, $471,269 in Calgary and $434,696 in Toronto. Residents of these cities have almost no chance of qualifying for any GST rebate.

To find out more about the rebate program (or lack thereof), check out Substantial Renovations and the GST/HST New Housing Rebate Guide.

Friday, April 8, 2011

98%

This week we had a pre-delivery inspection of the house.  It looks fantastic.  Everything is pretty much finished now with the exception of a few small things like vent covers, the backsplash in the kitchen, and some exterior painting.  The landscaping will also have to wait until the weather warms up.  We take possession in two weeks.  Very exciting.

Kitchen


ensuite shower


Kid's bathroom

Thursday, March 24, 2011

Exterior cladding, floors and painting finished

Here are some new photos of the house.  The exterior cladding is almost complete.  All of the brick, the siding and most of the cedar shakes are in place now.  Inside, the floors have been put in, the painting has been completed and most of the fixtures are in place.




The birth of American Modernism

In January, I was in Manhattan where I stumbled across the house of American modernist architect William Lescaze.  Lescaze is one of the pioneers of modernism in America and was clearly a man well ahead of his time.  He designed and built this home in 1933.  It must have seemed completely out of place in the 30s when he built it, but today it looks very contemporary. 


Tuesday, December 21, 2010

Electricity connected

Yesterday they connected the electricity and the bricklayers started working. Today they also turned on the water to test the plumbing for any leaks.

Sunday, December 19, 2010

Electrical, plumbing and HVAC complete



Wow, I can't believe it's been almost a month since the last post about the house.

As you can see, we now have a proper roof, doors and windows. Actually, the doors and windows came at the end of November and the roofing started at that time too. But then we were hit with a huge freezing rain storm and the roofers were unable to finish the job for a week or so until the ice melted. Then, it rained cats and dogs, and water poured into the house through the unfinished parts of the roof. Fortunately, it does not appear that there was much pooling of water on the floors because the OSB floors do not appear to have swelled anywhere, which they can do when water is left standing on them.

During this period I did a lot of research on OSB, and it turns out that the OSB they use in Canada for construction is coated with a wax or resin to make it water resistant for just such unfortunate events as a week of rain. The real danger point is where the OSB has been cut with a saw. The resin in the OSB can easily absorb water along the cut edges of the boards because at these points the water resistant coating has been cut away.

We did an inspection of the house last Friday and I did not notice any swollen parts of the floor, which is great. If if had swelled, the builder would have sanded it down to keep the floor level for the floor installation.

Once the week of bad weather passed, the builder was back on the job finishing the roof and installing the plumbing, electrical and HVAC as well as pouring the concrete floor in the basement and the garage. The furnace has been installed, along with the humidifier, and soon the Heat Recovery Ventilation Unit and tankless hot water heater will be installed. By next week they hope to have the house fully insulated and connected to the electricity grid so that they can start heating the house. Right now, they are heating the basement with propane heaters.

The concrete has also been poured for the front porch and the brick has arrived for the exterior cladding. Likely the bricklayers will be on site next week.

So, all in all things are moving along very quickly. I expect they should start drywalling in the new year.

Saturday, November 27, 2010

Avoid finishing your basement for a year after it is built

Today's Ottawa Citizen ran several interesting stories in its Homes section on renovating basements.

As I have remarked before, basements in older homes were often not designed for daily living. That was certainly the case in the home that previously occupied our lot. Even though the basement had been finished, there was no waterproofing around the basement walls, beams and ductwork were hung at only six feet above the floor, and the stairway to the basement was hidden away in the back of the kitchen - hardly making it feel like part of the main living space.

The stories in today's Citizen note the trend toward taller basement walls, fully waterproofed and insulated walls and integrating the basement space into the main living space. Here are some tips the stories offer:
  • If you are buying a newly-built production home, says Bruce Nicol, VP of Tartan Homes, wait at least a year before investing money in the basement. Some settling of a house is inevitable in the first year, and the standard warranty won't cover upgrades if your basement develops problems like water seepage.
  • Don't give too much credence to reality television shows that trumpet low-cost upgrades. If you are adding 1,000 square feet to a house, why would you think you could do it for $15,000. For a good basement upgrade integrated with a home's ovearll flow, be prepared to pony up $50 to $60 per square foot.
  • To ensure a basement reno is successful, it's not smart to scrimp. Make sure you continue all of the finishings downstairs, using the same carpeting and similar moldings.
  • It helps if the ceilings are higher, because the feeling of space is immediate, but paint and lighting can work wonders too. Donna Corey, the owner of Ottawa's KISS Design Group says she has often gone with a dark wall or two because darker colours seem to recede, creating the illusion of more space. Adding wall sconces at a little over six feet so that they will cast light downward can also create the illusion of greater ceiling height.
  • Upgrading your basement likely will not yield a financial payback. According to Jennifer Skuce, president and broker at RE/MAX metro-city realty, the return depends on the style and design of the house. Owners of a smaller home, such as a two bedroom, one bathroom bungalow, can expect a far greater return on their investment if they add a third bedroom, den or family room and a second bathroom in the basement because they will have effectively doubled the size of the home. With decent finishes, a 70% return would not be unreasonable. However, the payback is not nearly so lucrative in a larger two or three storey home. In that case, the return is more likely around 25 to 30%.
Finally, what's hot in the home's coolest area? According to the Citizen, here's what the pros consider to be the top 10 must haves:
  1. Home theatres - with big screens and bigger sound;
  2. Watering holes - not the 1960's rec-room style bar, but full on pub style bars with pull-taps, granite counters and subtle lighting;
  3. Wine cellars - temperature controlled with glass doors;
  4. Full kitchens - reserve the main floor kitchen for show or entertaining (this seems ridiculous to me);
  5. Playrooms - with play structures and toy storage;
  6. Games - foozeball, air hockey, pool etc. To this list I would add space to set up an electric train set and a race track;
  7. Fitness rooms - complete with all your necessary excercise equipment (or you could just go outside);
  8. Home spas - spa-like bathrooms with steam and body jets (for after all that excercise, or after all that buttery popcorn);
  9. Concrete floors - if heated. Also in vogue is ceramic tiles and engineered wood;
  10. Bright colours - accent walls can splash your basement with colour and character.

Wednesday, November 24, 2010

roofing

The builder finished putting OSB on the roof on the weekend and on Monday, the shingles arrived. Today, they started putting the shingles on, which should take to the end of the week. They also started to put some insulation in walls, but just in areas where they will need to build more, like the box for the fireplace, the bulkhead in the kitchen and where the stairs go.

Saturday, November 20, 2010

Second floor and roof



The last ten days have been busy at the house. Despite a few cold and wet days with unseasonable rain, they framers have managed to put up the second floor and the roof trusses. Apparently the roof shingles will come on Monday.

Thursday, November 11, 2010

Framing: 1st floor just about complete

Framing on the first floor is just about finished. By the end of today the floor joists for the second floor should be in place and the floor put down. By tomorrow, they should have most of the second floor walls erected.


Sunday, November 7, 2010

Habitat for Humanity gift home

In case you were unable to make it to the open house of the Habitat for Humanity gift house that was unveiled in Ottawa recently, DesignTies has an extensive photo series on their blog.

There is also a video on YouTube.

It's quite an impressive renovation.

Backfilling against the foundation




Backfilling of the house occurred last week. It took about two days for them to complete it, with several large trucks of fill delivered.

Waterproof membrane applied to foundation



In the last week an a half, a lot of progress has been made, starting with waterproofing the foundation.

Once the foundation was poured, a Platon membrane was applied to the outside of the foundation against living areas. Platon is a tough, waterproof, double dimpled, high-density polyethylene plastic membrane that keeps wet soil away from the foundation wall. The dimples create an air gap between the wall and the waterproof membrane. Any water that does find its way past the membrane flows to the footing drain. As an added benefit, wall moisture condenses on the back of the membrane and flows to the footing drain. This dries out the wall. Because Platon is not adhered to the wall, the wall can crack, shift and settle over the years without affecting Platon’s performance (although hopefully that wont be an issue).

Next step, back filling.


Wednesday, October 27, 2010

Big house, little house

It's interesting to watch the new house rise up out of the ground and it will be great to move in when it is finished. The new house is certainly bigger than our current residence, but with the hole dug and the foundation exposed it looks particularly big. Interestingly though, the footprint of the new house is not that different than the house we demolished. In fact, the living space on the main floor of the new house is about 200 square feet less than the former house. Even counting the garage, the footprint of the new house is only about 200 square feet bigger than the footprint of the former house. The difference, of course is in the second floor, which is where the additional space is added.

Sunday, October 24, 2010

Foundation poured

On Thursday or Friday, they poured the concrete for the foundation walls. They removed the forms on Friday.








Forming the basement

Last Thursday, they formed the basement.

\

weeping tile and stone fill

Once the footings were poured, weeping tile was placed around the footings and a stone slinger deposited stone fill all around the footings in preparation for the concrete.





House Demolition

Thanks to our neighbour, we now have some pictures of the demolition.


















t

Friday, October 15, 2010

concrete footings poured

The footings for the house were poured yesterday. Today, they had hoped to install the weeping tile around the outside of the footings, spread stone around the footings and erect the forms for the basement walls. However, with all the rain today, things were delayed. As you can see from the photo, some of the plumbing has also been installed.