Friday, October 1, 2010

Services capped, permits in hand

Yesterday, the gas company finally came and shut off the gas, the city came and took their water meter out of the house, and Uniform dug up the sewer line and capped it. All of these are prerequisites to getting the building and demolition permits. With those out of the way, Uniform was able to get the permits today.

Uniform is now trying to organize the contractor to demolish the house, and they hope to begin demolition on Monday or Tuesday.

Below are two pictures of the beginning of construction. The first taken earlier this week and the second taken Thursday.



Friday, July 30, 2010

Finally, some progress

Well, arranging the financing is still plodding along at a snails pace (I'll provide more details about that once everything is finalized), but we have made some progress with the builder.

We do not want to enter into a contract with the builder until we have the financing in place, however, summer is marching on and we were worried about getting the house started on time. In about another month or two it will start to get more expensive to build, primarily because after November 7, a 7% winter handling premium is applied to the cost of concrete and any masonry work has to be heated to ensure the mortar cures properly.

So, we met with the builder today and agreed to start some of the necessary soil engineering studies. These studies take about two weeks to complete and cost about $2500, but are required before a building permit application can be filed. If the financing falls through (which I don't think it will) then we're out $2500, but on the other hand, we could be two weeks ahead when the financing does come through.

Thursday, December 31, 2009

A topographic survey is essential if you are planning a large addition to your house

As I mentioned in a previous post, we were unable to obtain a Real Property Survey from the vendor when we bought our house. And, unfortunately, you cannot apply for a permit from the City of Ottawa for an addition to your house without having a survey. Furthermore, if the planned addition is larger than 500 square feet, then a topographic survey must be submitted with the permit application. In our case, we also required a topographic survey because our land slopes downwards at the back and we are toying with the idea of a walk-out basement or a series of terraced patios. In order for our architect to plan this, she needs a topographic survey to determine exactly what the elevations are.

Just before Christmas, we received the survey report from our surveyor. On the plus side, we now know that we have no property irregularities, and our architect can begin drafting up some conceptual ideas for the house. On the negative side, it cost $2625.00 to have the survey completed.

Now, you may well ask why didn't we just have the survey done as a condition of buying the house, and, thereby, save ourselves almost $400 in title insurance premiums. Well, the simple answer is timing. It took four weeks to have this survey completed, from the moment I contacted the firm, to the moment they delivered the report. There is no way the vendor would have settled for reciept of a survey as a condition of sale, given the trouble we had securing sufficient time from them to get financing in place. So, we had to pay for title insurance and then pay to have a survey done.

If you are interested in knowing what hoops you must jump through with the City in order to build an addition to your house, a pool, finish your basement, etc., the City of Ottawa has an informative Homeowner's guide for small projects, which outlines all the steps involved and a useful Residential Construction Checklist. It's good reading before you begin.