So, to ensure that the new house would not settle, the builder had to remove all of the organic soil until they reached undisturbed mineral soil - about 60 cm below the level of the bottom of the footings on the new house. Then, about 160 metric tonnes of engineered fill were dumped in the hole, spread and compacted to create a firm flat surface to build on.
Now the surface is ready to build on and the next step is to pour the concrete footings.
No comments:
Post a Comment