Friday, October 15, 2010

concrete footings poured

The footings for the house were poured yesterday. Today, they had hoped to install the weeping tile around the outside of the footings, spread stone around the footings and erect the forms for the basement walls. However, with all the rain today, things were delayed. As you can see from the photo, some of the plumbing has also been installed.

2 comments:

  1. Looks exciting Simon. I guess they must have dug up a line to the bouondary to install a sewer line and a water line. Do they do that for gas and electric too? I would think so. Mum

    ReplyDelete
  2. I would like to see some pictures on the process of footings. I'm a contractor and as well footings is a part of my job, as of now I am searching some new process of my field.

    ReplyDelete